Alum Creek WRF UV Upgrades


2022-2023 On-Call Construction Inspection Services


Northstar WRF Upgrades


Northstar and Lower Scioto WRFs SCADA Upgrades


2020 Prequalification for Professional Design Services


OECC Progressive Design Build Headworks and Aeration Upgrades



2020 On-Call Construction Inspection Services


Berlin Business Park Pump Station and Forcemain Project


DELAWARE COUNTY, OHIO REGIONAL SEWER DISTRICT TRANSFER AND RECYCLING CENTER DESIGN-BUILD-FINANCE-OPERATE PROJECT


2018 On-Call Construction Inspection Services


Package Plant Upgrades

The following documents are provided for reference:

Plans:


Control Systems Integrator for Delaware County Ohio Regional Sewer District Alum Creek Water Reclamation Facility Process Improvements Project

 


2018 Pre-qualification for Professional Design Services

 


November 2017 – Central Alum Creek Facilities Plan

 

The following documents are provided for reference:

 


September 2017 – Hyatts Rd Pump Station and Force Main

 

The following documents are provided for reference:

 


March 2017 – OECC Facilities Plan

 

The following documents are provided for reference:

Please Note: The following master plan documents are considered drafts until such time they are approved by the Board of Commissioners. These draft files are only to be used as reference for this RFP.

 


January 2017 Bundle – 5 Projects

 

Projects in this bundle:

1. NFPA 70E ArcFlash & NFPA 820 Analysis
The following information is provided for reference:

2. Peachblow Pump Station and Forcemain Upgrade Project
The following information is provided for reference:

3. Cheshire Pump Station Upgrade Project
The following information is provided for reference:

4. Lower Alum Creek Relief Pump Station and Forcemain Project
The following information is provided for reference:

5. Berkshire Township Pump Station and Forcemain Project
The following information is provided for reference: