Engineering Services for Water Reuse Study
East Alum Creek Pump Station Upgrade
Alum Creek WRF UV Upgrades
2022-2023 On-Call Construction Inspection Services
Northstar WRF Upgrades
Northstar and Lower Scioto WRFs SCADA Upgrades
2020 Prequalification for Professional Design Services
OECC Progressive Design Build Headworks and Aeration Upgrades
2020 On-Call Construction Inspection Services
Berlin Business Park Pump Station and Forcemain Project
DELAWARE COUNTY, OHIO REGIONAL SEWER DISTRICT TRANSFER AND RECYCLING CENTER DESIGN-BUILD-FINANCE-OPERATE PROJECT
2018 On-Call Construction Inspection Services
Package Plant Upgrades
The following documents are provided for reference:
Plans:
Control Systems Integrator for Delaware County Ohio Regional Sewer District Alum Creek Water Reclamation Facility Process Improvements Project
2018 Pre-qualification for Professional Design Services
November 2017 – Central Alum Creek Facilities Plan
The following documents are provided for reference:
September 2017 – Hyatts Rd Pump Station and Force Main
The following documents are provided for reference:
March 2017 – OECC Facilities Plan
The following documents are provided for reference:
Please Note: The following master plan documents are considered drafts until such time they are approved by the Board of Commissioners. These draft files are only to be used as reference for this RFP.
January 2017 Bundle – 5 Projects
Projects in this bundle:
1. NFPA 70E ArcFlash & NFPA 820 Analysis
The following information is provided for reference:
2. Peachblow Pump Station and Forcemain Upgrade Project
The following information is provided for reference:
3. Cheshire Pump Station Upgrade Project
The following information is provided for reference:
4. Lower Alum Creek Relief Pump Station and Forcemain Project
The following information is provided for reference:
5. Berkshire Township Pump Station and Forcemain Project
The following information is provided for reference: